Nature’s Gate & Subdivision & Residence

Location: Stillwater, MN

Scope of work:

Road

  • Removal of trees and vegetation
  • Relocate 7,000 cu yds of fill
  • Sediment pond construction
  • Storm sewer installation
  • Asphalt placement
  • Final grading & seeding

Residence:

  • Removal 15 acres of trees & vegetation
  • Built driveways and pads
  • Relocated 10,000 cu yds of soil onsite
  • 100’ x 180’ Riding Arena Installation
  • 80’ x 225’ Paddock Installation
  • 15 acre pasture preparation for seeding of natural grasses
  • Gravel preparation & placement for roads